Description The Mine is easily accessible by tarred road and good gravel roads, and has well-developed infrastructure. The name of the mine was changed several times during the past, mostly associated with changes of ownership.
The projected life of mine down to the 24 level or 730m level will be 25 years at a stopping advance rate of100m per year. mining at that depth is still economically viable.
A new pan plant must be constructed as the plant was stripped to the ground. Only a few crushers are available for future use.
OTHER SURFACE INFRASTRUCTURE
- Compressor house and compressors
- Electrical Transformers
- Workshops
- Stores
- Mine offices
- Dams and slimes dams
- Managerial and Admin offices
- Housing on site for Key Personnel
- Hostel for 200 mine workers
JOINT VENTURE
More stock available. Very profitable and there are already other interested parties. Urgently. Owners retain 30% and 10% for contractor. The contractor is one of the top diamond contractors. There are many tons of kimberlite gravel that can be washed. There are two shafts with large reserves. Research has shown there is no damage or water in the shafts.
Mineral buy out only
Geography Surveys Available
Financing Plan Available
Plant Process Flow Chart Available
Cash flow Available
Notes of purchase of unpolished diamonds (dates vary)