Description The mine is easily accessible by tarred and good gravel roads and has well-developed infrastructure. The mine resides on a scale of 4.77 km mining dyke on ground. Unfortunately, most of the historical dumps were sold. The remaining dumps total 144 458 m3 (300 000 t).
Positive news is that 60 000m3 (138 000 t) is actually ore stockpile, which was never treated. At diluted grade of 30 Cpht and average selling price of 300 USD/ carats (practically achieved by the only one contractor, who crushes the kimberlitic material) only this stockpile will generate ZAR 85 000 000.
Asking price is 170 Million ZAR (about $20M USD).